Product
Stark EMS comes in two packages.
Monitoring
With Monitoring you see live and historically what happens on your connection, with an alert when something fails.
Monitoring & Control
With Monitoring & Control, Stark EMS also controls your site, and every control function is included as standard.
Control runs on a controller in the switchboard, so decisions are made on site. Heat control and partner integrations are available as extras.
Functions
| Function | What it does | Technical name | Package |
|---|---|---|---|
| Peak shaving | The battery discharges as soon as demand rises above the set threshold, and recharges when there is room. | peak shaving | Monitoring & Control |
| Per-phase limits | The same control for each phase, for installations with an uneven load. | asymmetric peak shaving | Monitoring & Control |
| Limits per cable and board | Monitors the cables and distribution boards on site as well as the main connection, each with its own limit. | per-feeder charging clusters | Monitoring & Control |
| Share charging power | Shares the available power across all charge points, in order of priority. | charging cluster, OCPP | Monitoring & Control |
| Limit export | Keeps export below a set limit, using the battery and inverters. | export limit | Monitoring & Control |
| User signal | You set the threshold yourself — at your contracted capacity, or at a safe margin below it. As consumption approaches that threshold, the signal changes from green to red. | traffic light | Monitoring & Control |
Stay within your connection
-
Peak shaving
The battery discharges as soon as demand rises above the set threshold, and recharges when there is room.
-
Per-phase limits
The same control for each phase, for installations with an uneven load.
-
Limits per cable and board
Monitors the cables and distribution boards on site as well as the main connection, each with its own limit.
-
Share charging power
Shares the available power across all charge points, in order of priority.
-
Limit export
Keeps export below a set limit, using the battery and inverters.
-
User signal
You set the threshold yourself — at your contracted capacity, or at a safe margin below it. As consumption approaches that threshold, the signal changes from green to red.
| Function | What it does | Technical name | Package |
|---|---|---|---|
| Use your own solar | Surplus goes into the battery; a shortfall comes out of it. | self-consumption | Monitoring & Control |
| Planning on dynamic prices | Plans 24 hours ahead in quarter hours, on day-ahead prices and a forecast of consumption and generation. | time-of-use, forecasting | Monitoring & Control |
| Charging matched to solar forecast | Keeps room free in the battery for the midday solar peak. | grid-optimised charging | Monitoring & Control |
| Keep a reserve | Holds a minimum state of charge, for example for backup power. | capacity reserve | Monitoring & Control |
Lower energy cost
-
Use your own solar
Surplus goes into the battery; a shortfall comes out of it.
-
Planning on dynamic prices
Plans 24 hours ahead in quarter hours, on day-ahead prices and a forecast of consumption and generation.
-
Charging matched to solar forecast
Keeps room free in the battery for the midday solar peak.
-
Keep a reserve
Holds a minimum state of charge, for example for backup power.
| Function | What it does | Technical name | Package |
|---|---|---|---|
| Surplus or direct charging | Per charge point: charge on solar surplus or directly at full power, with priority for selected charge points. | surplus charging, priority | Monitoring & Control |
| Fast charging and HPC | DC chargers and High Power Chargers count within the limits of the connection and cables; a battery absorbs the peaks. | DC charging, HPC | Monitoring & Control |
| Switch on a measured value | Switches a device on or off when surplus or state of charge crosses a threshold. | threshold control | Monitoring & Control |
| Heat as a buffer | Controls heating elements and SG-ready heat pumps on surplus or price. | power-to-heat, SG-ready | Extra |
| Reactive power and voltage | Regulates cos φ and reactive power for installations with grid-quality requirements. | cos φ, Q(U) | Monitoring & Control |
Charging, switching and heat
-
Surplus or direct charging
Per charge point: charge on solar surplus or directly at full power, with priority for selected charge points.
-
Fast charging and HPC
DC chargers and High Power Chargers count within the limits of the connection and cables; a battery absorbs the peaks.
-
Switch on a measured value
Switches a device on or off when surplus or state of charge crosses a threshold.
-
Heat as a buffer
Controls heating elements and SG-ready heat pumps on surplus or price.
-
Reactive power and voltage
Regulates cos φ and reactive power for installations with grid-quality requirements.
| Function | What it does | Technical name | Package |
|---|---|---|---|
| Live and historical insight | Consumption, generation, charging and battery, in the browser and on your phone. | portal | MonitoringMonitoring & Control |
| Alerts | An alert when something fails or when an installation goes offline. | alerting | MonitoringMonitoring & Control |
| Building management link | Shares measurements with other systems and receives commands from them. | REST, Modbus TCP, MQTT | Monitoring & Control |
| Multiple connections together | Controllers on a business park coordinate power among themselves. | edge-to-edge | Monitoring & Control |
Insight and connection
-
Live and historical insight
Consumption, generation, charging and battery, in the browser and on your phone.
-
Alerts
An alert when something fails or when an installation goes offline.
-
Building management link
Shares measurements with other systems and receives commands from them.
-
Multiple connections together
Controllers on a business park coordinate power among themselves.
Stark EMS integrates brand-independently via Modbus, SunSpec and OCPP. See integrations
Extras
-
Heat control
Controls heating elements and SG-ready heat pumps on surplus or price, so heat works as a buffer.
The traffic light: see it before it goes wrong.
traffic light
You set the threshold yourself — at your contracted capacity, or at a safe margin below it. As consumption approaches that threshold, the signal changes from green to red. At red, an audible alarm sounds and, under an agreed protocol, loads can be temporarily switched off.
Below your threshold. Threshold 225 kW, Limit 250 kW.
You stay in control
Together with you we agree upfront what Stark EMS may and may not do, so you always know where you stand. And we look beyond the software: if something in your installation needs attention, we tell you and help find the solution.